Careermidway.com | Today's Jobs in Qatar |
- Fitter (Doha)
- Electrical Engineer (Doha)
- Heating and Air Conditioning Mechanic (Doha)
- Fabrication Engineer (Doha)
- Pipping Engineer/Pipping Supervisor (Doha)
- Mechanical Engineer (Doha)
- Planning Engineer (Doha)
- Counter Staff for Travel Agency (Qatar)
Posted: Repairs and checks mechanical defects in everything else that is operated by the use of machine. After checking, necessary measures that are to be undergone are discus and thus made. Fabricates and alters special construction equipment; designs, lays out, repairs or fabricates, with or without blueprints, a variety of metal work ranging from small items to construction equipment to ornamental iron work; cuts, fits, and welds metal, using gas and electric welding equipment; and does brazing and soldering. Incharge of doing inventory and maintains work records to ensure that no machine is mixed up with the other. Incharge of training people and employees on the safety practices necessary to be able to fix mechanical problems. |
Posted: 1. Develop projects from concept to completion 2. Maintain control of project expenditures to avoid cost overruns 3. Supervision of contractors and vendors to maintain control of project schedules and costs 4. Conducts field investigations and prepares reports for problems or issues 5. Mentor and evaluate electrical engineering staff and design team 6. Works with project managers to assure work meets business needs, applicable codes and standards of quality |
Heating and Air Conditioning Mechanic (Doha) Posted: |
Posted: The responsibilities of fabrication engineers include supervising projects such as installations, reviewing construction and engineering documents, identifying and solving deficiencies in production, supervision of project and/or job site activities and employees, as well as diagnosing and repairing technical equipment failure. |
Pipping Engineer/Pipping Supervisor (Doha) Posted: Having the responsibility of all Technical Query regarding piping works As-built design and proposal of modification Material take-off and piping schedule Erection and Installation Procedure Tie-in preparation and scheduling Lifting plan preparation Procedure Test package preparation as per Procedure To ensure that all site activities are performed in environmentally safe and responsible manner Supervising piping works to be performed by construction contractor and insure the compliance with established construction schedule and project requirements Coordinate among various construction contractor and discipline supervisor executing piping work Verify the availability and adequacy of the material and drawing Coordinate the construction contractor ensuring the compliance with the applicable specification and standard Ensure the quantity of the work executed by the construction contractor and monitor the compliance with established schedule Evaluate the construction contractor work capability according to the programs to be implemented and promote corrective action where necessary Ensure the proper execution of inspection and test in accordance with the field quality control plan and monitor the adequacy result Solve the cases of no-conformity with the support of piping superintendent where necessary Point out to the piping superintendent any problem or deviation which cannot be solve by him and proposing possible solution Give assistance to piping superintendent in the discussion with the proponent representative and construction contractor where necessary Assist in the field engineering works such as field revision of isometric drawing |
Posted: Design and develop energy producing machines and ensure that machines are fully operational. Design and develop energy using machines. Determine the needs of the customer. Determine the overall cost the required equipment. Supervise equipment installation and production. Operate equipment and ensure that the operating environment is safe. Service the equipment to ensure their long life. |
Posted: 1) selecting the appropriate techniques and sequence of events for a particular project; 2) analysing construction sites and local environments to determine appropriate logistics solutions and resources; 3) drawing up plans and presenting schedules of work, often with visual aids such as bar charts and procedures diagrams; 4) using specialist planning computer software like PM3 or PM6 etc 5) preparing logistics plans and pricing schedules for individual projects; 6) monitoring progress throughout the construction process and comparing this with the projected schedule of work; 7) liaising with the site agent and surveyor throughout the process, making adjustments to projects as necessary; 8) providing advice and support on the development of specific systems |
Counter Staff for Travel Agency (Qatar) Posted: |
You are subscribed to email updates from Careermidway.com | Today's Jobs in Qatar To stop receiving these emails, you may unsubscribe now. | Email delivery powered by Google |
Google Inc., 20 West Kinzie, Chicago IL USA 60610 |
0 comments:
Post a Comment